INNOVATIVE RELIABLE PROFESSIONAL

DESIGN AND LAYING OF EXTERNAL ENGINEERING NETWORKS

From the "project" stage to "turnkey" installation with subsequent warranty service

1Household sewerage K1 and rain sewerage K2

2Arrangement of landscaping at construction sites

3Water supply networks B1

4Heat supply networks

5Gas supply networks

STAGES OF ORDER EXECUTION

PIPELINES WARRANTY

Management

Effective management of the construction process allows you to reduce the project budget and implement tasks in the shortest possible time.

Technical control

Full technical control at all stages of work makes it possible to guarantee compliance with client requirements.

Fulfillment of obligations

We fulfill our commitments. We offer the optimal solution for each task.

OUR OBJECTS

We offer you to look at some examples of our work

Execution of a complex of construction and installation works on laying of external engineering networks on the streets of Vozdvyzhenskaya, Goncharna, Kozhemyatskaya, Digtyarnaya in Kyiv.
  • Household sewerage K1.
  • Water supply networks B1.
  • Heat supply networks T1, T2.
Construction on Akhmatova Street and Dniprovska Naberejna in Darnytskyi district in Kyiv.
  • Water supply networks B1.
  • Household sewerage K1.
Kyiv Engineering Gymnasium on 12A Knyazhiy Zaton Street, in Darnytskyi district of Kyiv.
  • Water supply networks B1.
  • Household sewerage K1.
Execution of a complex of construction and installation works on laying of external engineering networks on the object: Social city on Hnata Khotkevycha Street in Desnianskyi district of Kyiv.
  • Water supply networks В1.
Construction of a residential-office-trade-entertainment complex at 52/1 Anri Barbusse Street in the Pecherskyi district of Kyiv.
  • Water supply networks B1: 150 mm, 300 mm, 400 mm.
  • Household sewerage K1: 100 mm, 150 mm, 300 mm, 400 mm.
  • Rain sewerage K2: 100 mm, 160 mm, 200 mm, 300 mm, 400 mm, 500 mm, 800 mm.
  • Heat supply networks: 159/250 mm, 219/315 mm, 273/450 mm, 426/560 mm.
Construction of residential buildings of a hotel-residential complex with social and domestic premises at 92B Akademika Glushkova Avenue in Holosiivskyi district of Kyiv.
  • Household sewerage K1: 400 mm.
  • Water supply networks B1: 400 mm, 560 mm, 800 mm.
Construction of residential buildings on 5/15 Dubinina Street, in Holosiivskyi district of Kyiv.
  • Household sewerage K1.
  • Water supply networks В1.
Construction of residential buildings with built-in non-residential premises and social and household facilities at 4A Antonova-Ovsienko Street, in the Sviatoshynskyi district of Kyiv.
  • Water supply networks B1: 400 mm, 225 mm.
  • Household sewerage K1: 225 mm.
  • Heat supply networks: 108/200 mm, 219/315 mm.
Construction of residential buildings with socio-cultural facilities and parking on the 3-B Feodosiyska street, in Holosiivskyi district of Kyiv.
  • Water supply networks B1: 160 mm, 315 mm, 560 mm.
  • Household sewerage K1: 160 mm, 400 mm.
Residential buildings with socio-cultural facilities and underground parking on Drahomanova Street in the Dniprovskyi district of Kyiv.
  • Water supply networks В1: 110 mm, 160 mm, 315 mm.
  • Household sewerage K1: 225 mm, 450 mm.
  • Rain sewerage K2: 110 mm, 160 mm, 225 mm, 315 mm, 400 mm.
  • Heat supply networks: 159/250 mm, 19/315 mm.
Reconstruction on Vasylkivska Street in the area from Holosiivska Square to Amurska Square in Holosiivskyi District of Kyiv.
  • Household sewerage K1: 150 mm, 200 mm, 300 mm, 500 mm.
  • Rain sewerage K2: 300 mm, 500 mm, 600 mm, 1000 mm.
The client is “Boryspilbud” LLC. Execution of a complex of construction and installation works on laying of external engineering networks on the object: Construction of a residential complex with objects of public service on 3 Trutenka Street, in Holosiivskyi district of Kyiv.
  • Water supply networks B1: 110 mm.
  • Household sewerage K1: 110-160 mm, 200 mm, 300 mm.
  • Rain sewerage K2: 315 mm, 355 mm, 500 mm.
  • Heat supply networks T1,T2: 133/225 mm.
The client is “Ukrrestavratsiya” LLC. Construction works on relocation of the heat supply network on the site: Reconstruction with a superstructure for a hotel of a non-residential building at 17 Esplanadna Street in the Pecherskyi district of Kyiv.
  • Heat supply networks Т1, Т2: 325/450 mm.
Client UE "Zhitloinvestbud-UKB". Execution of works on construction of external water supply networks, household sewerage K1 and rain sewerage K2 on the object: Construction of a residential building with built-in office buildings and underground parking at 32 Shulyavska Street in Shevchenkivskyi district of Kyiv.
  • Household sewerage K1: 315 mm, 500 mm.
  • Water supply networks В1: 300 mm.
  • Rain sewerage K2: 400 mm.
Laying of household sewerage networks K1 on the object: Construction of a residential complex with a shopping center and built-in office and social facilities with underground parking on the Revutsky street in the Darnytskyi district of Kyiv.
  • Household sewerage K1: 450 mm.
Laying of external engineering networks of water supply B1, household sewerage K1 and rain sewerage K2 on the object: Construction of a multifunctional residential complex in Ukrainka on a land plot of 1.0846 ha near Sosnova Street in the Ukrainian Council of Obukhiv district, Kyiv region.
  • Household sewerage K1: 400 mm.
  • Water supply networks В1: 300 mm.
  • Rain sewerage K2.
Laying of engineering networks of water supply B1, household sewerage K1 and rain sewerage K2 on the object: Construction of a residential complex with built-in non-residential premises at 23 Akademika Kablukova Street in Solomianskyi district of Kyiv.
  • Household sewerage K1
  • Water supply networks B1
  • Rain sewerage K2
Laying of external engineering networks of water supply system B1, household sewerage K1 and rain sewerage K2 on the O. Honchara street and Observatorniyi street on the object: Construction of a trade-office-residential center with underground parking between 15-A Vorovskoho Street, 38-B O. Honchara, 48/2 O. Honchara street, in the Shevchenkivskyi district of Kyiv.
  • Household sewerage K1: 400 mm.
  • Water supply networks В1: 300 mm.
  • Rain sewerage K2.
Laying of external engineering networks of water supply B1 and household sewerage K1 on the object: Construction of a residential building with built-in public premises at the intersection of Antonovycha (Gorkyi) and Volodymyro-Lybidska streets in Holosiivskyi district of Kyiv.
  • Household sewerage K1: 200 mm, 300 mm.
  • Water supply networks В1: 200 mm, 300 mm.
Complex of works on arrangement of water supply and sewerage networks on the object: Reconstruction of non-residential building premises for warehouses at the address: 67 Peremohy Avenue, building 3 (letter 8 (number)) in Sviatoshynskyi district of Kyiv.
  • Household sewerage K1
  • Water supply networks B1: 400 mm.
Execution of a complex of works on arrangement of networks of household sewerage K1 and rain sewerage K2 (removal from under the building spot) on the object: Construction of a residential complex on 25A Degtyarivska Street in Shevchenkivskyi distr
  • Household sewerage K1: 500 mm
  • Rain sewerage K2: 500 mm.
Laying of an external network of household sewerage on the object: Construction of a residential-office, trade complex with ground and underground parking lots and built-in-attached premises of public, social and commercial purpose on the 12 Akademika Tupoleva street and 2-B Salyutniy street in the Shevchenkivskyi district of Kyiv.
  • Household sewerage K1: 600 mm.

CONTACTS

WE WILL BE GLAD TO COOPERATE WITH YOU AS RELIABLE PARTNERS.

Аdress:

04080, Ukraine, Kyiv

40/5 Urkivska street